Send us your Bill of Materials and we will check availability, confirm lead times, and identify alternatives where a part is short or obsolete. We work from both our in-stock inventory and our supplier network, so a BOM inquiry does not depend on a single source.
We do not quote from assumption. Every line item is checked against actual stock or confirmed supplier availability before a quote is issued.
What happens after you send your BOM
- Line-by-line review. We review each line item for part number accuracy, package type, and quantity. If a part number is ambiguous or has multiple package variants, we ask before quoting.
- Stock and lead-time check. In-stock items are confirmed against our inventory. Items not in stock are checked with our supplier network for availability and lead time.
- Shortage and alternative flagging. If a part is short, obsolete, or has a lead time that threatens your build schedule, we tell you early and propose alternatives where possible.
- Quote with clear status per line. Your quote shows which items are in stock, which are sourced, and which need your decision on an alternative. You are not left guessing which lines are firm.
What we need from you
- BOM file in Excel, CSV, or PDF format
- Part numbers with manufacturer names where available
- Quantities per line
- Target delivery date or build schedule
- Any acceptable alternatives or cross-reference preferences
If your BOM includes programmable ICs, PCB fabrication, or assembly requirements, tell us at the same time—we can coordinate those in the same quote.
What we check before quoting
| Check | Why it matters to you |
|---|---|
| Part number and package match | Prevents wrong-package parts from entering your build |
| Stock vs. supplier availability | Separates what is immediately available from what needs lead time |
| Lifecycle status | Flags obsolete or end-of-life parts before they become a production risk |
| Alternative options | Gives you a decision point early, not after the deadline |
What we do not do
- We do not quote a line item without confirming stock or supplier availability.
- We do not substitute a part without your approval.
- We do not accept a BOM and then go silent. If a line is taking longer to confirm, we tell you which line and why.
How to send your BOM
Send your BOM file and target schedule to sales@icharbor.com. We will confirm receipt, review the lines, and come back with a quote showing stock status, lead times, and any alternatives that need your decision. If your BOM has items we cannot source, we will tell you directly rather than leave them off the quote.
